| This chapter identifies criteria for experimental
Regulatory
facilities and steam and power conversion systems.
Guide 1.70 does not address experimental facilities.
One of the principal missions of many DOE reactors is to
This section identi-
conduct research and perform experiments.
fies criteria for research facilities and conducting experiments.
Code of Federal Regulations
10.1.1
10 CFR 50.55a, "Codes and Standards."
A.
10 CFR 50.59, "Changes, Tests, and Experiments."
B.
10 CFR 50, Appendix A, "General Design Criteria for
C.
Nuclear Power Plants," (Appropriate GDC should be applied depend-
ing on the importance to safety of an experimental facility).
.
10 CFR 50, Appendix B, "Quality Assurance Criteria
D.
for Nuclear Power Plants and Fuel Reprocessing Plants,"
(Appropriate criteria should be applied depending on the impor-
tance to safety of an experimental facility).
USNRC Regulatory Guides, SRP Branch Technical Positions
10.1.2
and Appendices
Regulatory Guide 1.26, "Quality Group Classifica-
A.
tions and Standards for Water-, Steam-, and Radioactive-Waste-
Containing Components of Nuclear Power Plants."
B.
1.29,
"Seismic Design Classifi-
Regulatory
Guide
cation."
C.
Regulatory Guide 2.1, "Shield Test Program for
Evaluation of Installed Biological Shielding in Research and
Training Reactors."
D.
Regulatory
Guide 2.4, "Review of Experiments for
Research Reactors."
Guide 2.2, "Development of Technical
E.
Regulatory
Specifications for Experiments in Research Reactors."
10-1
|