|
| ![]() Regulatory Guide 4.4, "Reporting Procedure for
G.
Mathematical Models Selected to Predict Heated Effluent Disper-
sion in Natural Water Bodies."
Appendix A, "Hydrologic Engineering
SRP
2.4.1,
H.
Site Visits."
Branch Technical Position HGEB-1,
SRP 2.4.12,
I.
"Safety-Related Permanent Dewatering Systems."
Codes and Standards
2.4.3
ANSI N170-1976, "Standards for Determining Design
A.
(This standard was
Basis Flooding at Power Reactor Sites."
revised and issued as ANSI/ANS 2.8-1981, "Determining Design
Basis Flooding at Power Reactor Sites.")
2.4.4
Supplementary Information
"Standard
Review
Plan,"
NUREG-0800,
USNRC
A.
June 1987.
"Hydrologic Description."
1.
SRP 2.4.1,
"Floods."
2.
SRP 2.4.2,
"Probable Maximum Flood (PMF) on
3.
SRP 2.4.3,
Streams and Rivers."
"Potential Dam Failures."
4.
SRP 2.4.4,
5.
SRP
"Probable Maximum Surge and
2.4.5,
Seiche Flooding."
"Probable Maximum Tsunami Flood-
6.
SRP 2.4.6,
ing."
7.
"Ice Effects."
SRP 2.4.7,
"Cooling Water Canals and Reser-
8.
SRP 2.4.8,
voirs."
9.
"Channel Diversions."
SRP 2.4.9,
"Flooding Protection Require-
10. SRP
2.4.10,
ments."
"Cooling Water Supply."
11.
SRP 2.4.11,
SRP 2.4.12,
"Ground Water."
12.
2-8
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |