| GDC
4, "Environmental
and
Missle
Design
1.
Bases."
SRP Branch Technical Positions
USNRC Regulatory Guides,
3.6.2
and Appendices
"Instrument Lines Pene-
1.11,
Regulatory Guide
A.
trating Primary Reactor Containment."
"Seismic Design Classifi-
1.29,
Guide
Regulatory
B.
cation."
Branch Technical Position ASB 3-1,
SRP 3.6.1,
C.
"Protection Against Postulated Piping Failures in Fluid Systems
(This BTP was revised by 53 FR 1968,
Outside Containment."
01/25/88.)
Branch Technical Position MEB 3-1,
SRP 3.6.2,
D.
"Postulated Rupture Locations in Fluid System Piping Inside and
Outside Containment."
Codes and Standards
3.6.3
ASME Boiler and Pressure Vessel Code.
A.
Section III, "Rules for
Construction
of
1.
Nuclear Power Plant Components," Division 1.
"Rules for Inservice Inspection of
Section XI,
2.
Nuclear Power Plant Components."
Supplemental Information
3.6.4
NUREG-0800, USNRC "Standard Review Plan," June
A.
1987.
"Plant Design for Protection
3.6.1,
SRP
1.
in Fluid Systems Outside Con-
Against Postulated Piping Failures
tainment."
SRP 3.6.2, Determination of Rupture Loca-
2.
tions and Dynamic Effects Associated with the Postulated Rupture
of Piping."
NUREG-0609, "Asymmetric Blowdown Loads on PWR Pri-
B.
mary Systems, " USNRC, January 1981.
"Prediction of Blowdown and Jet Thrust Forces?"
C.
F.J. Moody, ASME Paper 69 HJ-31, August 6, 1969.
3-7
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |