Click here to make tpub.com your Home Page

Page Title: Codes and Standards
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



1.95,  "Protection of Nuclear
Regulatory  Guide
C.
Power Plant Control Room Operators Against an Accidental Chlorine
Release."
"Acceptance Criteria for
SRP  6.4, Appendix A,
D.
Valve or Damper Repair Alternative."
6.4.3
Codes and Standards
ANSI/ASME  N509-1980,  "Nuclear Power Plant Air
A.
(This standard was revised and
Cleaning Units and Components."
issued as ANSI/ASME N509-1989, "Nuclear Power Plant Air Cleaning
Units and Components."
"Testing of Nuclear Air
N510-1980,
ANSI/ASME
B.
Cleaning Units."
6.4.4
Supplemental Information
USNRC
"Standard
Review
Plan,"
A.
NUREG-0800,
June 1987.
SRP 6.4, "Control Room Habitability System."
1.
B.
NUREG-0737 ,
"Clarification of TMI Action Plan
Requirements, " Item III.D.3.4, USNRC, November 1980.
"Protection From Toxic Gas
C.
IE Circular 80-03,
Hazards."
D.
IE Information Notice 86-76, "Problems Noted in
Control Room Emergency Ventilation Systems."
ERDA 76-21,  "Nuclear Air Cleaning Handbook," Oak
E.
Ridge National Laboratory, C.A. Burchsted, I.E. Kahn and A.B.
Fuller, March 31, 1976.
F.
"Nuclear Power Plant Control Room Ventilation Sys-
tem Design for Meeting General Design Criterion 19," K.G. Murphy
and K.M Campe, 13th AEC Air Cleaning Conference, August 1974.
G.
TID-25951,  "Reactor  Shielding
for
Nuclear
Engineers," N.M. Schaeffer, USAEC, 1973.
H.
"Engineering Compendium on Radiation Shielding,"
R.G. Jaeger, et al., eds., Vol. 1,  "Shielding Fundamentals and
Methods," Springer-Verlag, 1968.
6-12


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business