|
| Guide
1.75, "Physical Independence of
E.
Regulatory
Electric Systems."
F.
Regulatory
Guide
1.105, " Instrument Setpoints for
Safety-Related Systems."
G.
Regulatory
"Periodic Testing of
Guide
1.118,
Electric Power and Protection Systems."
H.
Regulatory
"Criteria for Power,
Guide
1.153
Instrumentation, and Control Portions of Safety Systems."
I.
SRP Appendix 7-A, Branch Technical Position ICSB
3, "Isolation of Low Pressure Systems from the High Pressure
Reactor Coolant System."
J.
SRP Appendix 7-A, Branch Technical Position ICSB
4, "Requirements on Motor-Operated Valves in the ECCS Accumulator
Lines."
K.
SRP Appendix 7-A, Branch Technical Position ICSB
21, "Guidance for Application of Regulatory Guide 1.47."
L.
SRP Appendix 7-A, Branch Technical Position ICSB
22, "Guidance for Application of Regulatory Guide 1.22."
M.
SRP 7.1,
Appendix A, "Acceptance Criteria and
Guidelines for Instrumentation and Control Systems Important to
Safety."
N.
SRP 7.1, Appendix B, "Guidance for Evaluation of
Conformance to IEEE Std. 279."
7.6.3
Codes and Standards
A.
ANSI/IEEE 603-1980, "IEEE Standard Criteria for
Safety Systems for Nuclear Power Generating Stations."
B.
IEEE 279-1971, "Criteria for Protection Systems
for Nuclear Power Generating Stations." (This standard was with-
drawn on June 14, 1984 and incorporated into ANSI/IEEE 603-1980,
"IEEE Standard Criteria for Safety Systems for Nuclear Power Gen-
erating Stations.")
C.
IEEE
338-1987, "IEEE Standard Criteria for the
Periodic Surveillance Testing of Nuclear Power Generating Station
Safety Systems."
7-16
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |