|
| SRP 17.3, "Quality Assurance Program Descrip-
2.
tion."
WASH 1309, "Guidance on Quality Assurance Require-
B.
ments During the Construction Phase of Nuclear Power Plants,"
USAEC, May 1974.
WASH 1283, "Guidance on Quality Assurance Require-
C.
ments During Design and Procurement Phase of Nuclear Power
Plants," USAEC, May 1974.
"Seismic Analysis for
D. IE Bulletin 79-14, Rev. 1,
As-Built Safety-Related Piping Systems."
84-54, "Deficiencies in
IE Information Notice
E.
Design Base Documentation and Calculations Supporting Nuclear
Power Plant Design."
17.2.1
Code of Federal Regulations
10 CFR 50.34(b)(6)(ii), "Contents of Applications;
A.
Technical Information."
10 CFR 50.54, "Conditions of Licenses."
B.
10 CFR 50.55, "Conditions of Construction Permits."
C.
10 CFR 50.55a, "Codes and Standards."
D.
10 CFR 50.71, "Maintenance of Records, Making of
E.
Reports."
"General Design Criteria
F.
Appendix A,
10 CFR 50,
for Nuclear Power Plants."
G.
10 CFR 50, Appendix B, "Quality Assurance Criteria
for Nuclear Power Plants and Fuel Reprocessing Plants."
17.2.2
USNRC Regulatory Guides SRP Branch Technical Positions
and Appendices
Regulatory Guide 1.8, "Qualification and Training
A.
of Personnel for Nuclear Power Plants."
Regulatory Guide 1.26, "Quality Group Classifica-
B.
tions, and Standards for Water-, Steam-, and Radioactive-Waste-
Containing Components of Nuclear Power Plants."
17-5
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |