| 13.4.1
Code of Federal Regulations
A.
10 CFR 50.55, "Conditions of Construction Permits."
B.
10 CFR 50.59, "Changes, Tests, and Experiments."
13.4.2
USNRC Regulatory Guides, SRP Branch Technical Positions
and Appendices
A.
Regulatory Guide 1.8, "Qualification and Training
of Personnel for Nuclear Power Plants."
B.
Regulatory Guide
1.33, "Quality Assurance Program
Requirements (Operation)."
13.4.3
Codes and Standards
A.
ANSI/ANS 3.1-1981, "Selection, Qualification, and
Training of Personnel for Nuclear Power Plants."
(This standard
was revised and issued as ANSI/ANS 3.1-1987, "Selection,
Qualification, and Training of Personnel for Nuclear Power
Plants.")
B.
ANSI/ANS
3.2-1976, "Administrative Controls and
Quality Assurance for the Operational Phase of Nuclear Power
Plants."
(This standard was revised and issued as ANSI/ANS 3.2-
1988, "Administrative Controls and Quality Assurance for the
Operational Phase of Nuclear Power Plants.")
13.4.4
Supplemental Information
A.
NUREG-0800,
USNRC "Standard Review Plan," June
1987.
1.
SRP 13.4, "Operational Review."
B.
NUREG-0737,
"Clarification of TMI Action Plan
Requirements, " Item I.B.1.2, USNRC, November 1980.
C.
IE
Information
Notice
84-51,
"Independent
Verification."
13.5.1
Code of Federal Regulations
A.
10 CFR 50.34, "Contents of Applications; Technical
Information."
13-9
|