|
| "Licensing Requirements for Pending
NUREG-0718,
B.
Applications for Construction Permits and Manufacturing License,"
USNRC, March 1981.
NUREG-0737,
"Clarification of TMI Action Plan
C.
Requirements," USNRC, November 1980.
NUREG-0694,
D.
"TMI-Related Requirements for New
Operation Licenses," USNRC, June 1980.
A.
10 CFR 50.34, "Contents of Applications, Technical
Information."
B.
10 CFR 50.55a, "Codes and Standards."
C.
10 CFR 50, Appendix A, "General Design Criteria for
Nuclear Power Plants."
1.
GDC 2,
"Design Bases for Protection Against
Natural Phenomena."
2.
GDC
4,
"Environmental and Missile Design
Bases."
3.
GDC 13,
"Instrumentation and Control."
4.
GDC 19,
"Control Room."
5.
GDC 34,
"Residual Heat Removal."
6.
GDC 35,
"Emergency Core Cooling."
7.
GDC 38,
"Containment Heat Removal."
7.4.2
USNRC Regulatory Guides, SRP Branch Technical Positions
and Appendices
A.
Regulatory Guide 1.22, "Periodic Testing of Pro-
tection System Actuation Functions."
B.
Regulatory Guide
1.47, "Bypassed and Inoperable
Status Indication for Nuclear Power Plant Safety Systems."
C.
Regulatory
Guide
1.53, "Application of the
Single-Failure Criterion to Nuclear Power Plant Protection Sys-
tems."
7-10
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |