| M.
Nuclear Utility Task Action Committee (NUTAC)
Reports:
INPO 83-047 (NUTAC), "Component Verification
1.
and System Validation Guideline," Institute of Nuclear Power
Operations/CRDR NUTAC, December 1983.
83-046 (NUTAC), "Control Room Design
2.
INPO
Review Task Analysis Guideline," Institute of Nuclear Power Oper-
ations/CRDR NUTAC, December 1983.
83-042 (NUTAC), "Control Room Design
3.
INPO
Review Survey Development Guideline," Institute of Nuclear Power
Operations/CRDR NUTAC, November 1983.
83-026 (NUTAC), "Control Room Design
5.
INPO
Review Implementation Guideline," Institute of Nuclear Power
Operations/CRDR NUTAC, July 1983.
4.
INPO 83-036 (NUTAC), "Human Engineering Prin-
ciples for Control Room Design Review," Institute of Nuclear
Power Operations/CRDR NUTAC, September 1983.
This section identifies criteria for the review of human
engineering principles applied to the SPDS review of the
verification and validation program relating to SPDS design,
testing, human performance aspects, hardware and software qual-
ity, and parameter displays, and review of the adequacy and basis
of the parameters selected for display to represent critical
plant functions.
Code of Federal Regulations
18.2.1
A.
10 CFR 50.34(f), "Contents of Application; Techni-
cal Information."
B.
10 CFR 50, Appendix A, "General Design Criteria for
Nuclear Power Plants."
GDC 19, "Control room."
1.
USNRC Regulatory Guides, SRP Branch Technical Positions
18.2.2
and Appendices
A.
Regulatory
Guide
1.97, "Instrumentation for
Light-Water-Cooled Nuclear Power Plants to Assess Plant and
Environs Conditions During and Following an Accident."