"Codes and Standards."
10 CFR 50.55a,
B.
"Loss of All Alternating Current
10 CFR 50.63,
C.
Power."
10 CFR 50, Appendix A, "General Design Criteria for
D.
Nuclear Power Plants."
"Design Bases for Protection Against
GDC 2,
1.
Natural Phenomena."
"Environmental and Missile Design
GDC
4,
2.
Bases."
"Sharing of Structures, Systems, and
GDC
5,
3.
Components."
17, "Electric Power Systems."
GDC
4.
18, "Inspection and Testing of Electrical
5.
GDC
Power Systems."
44, "Cooling Water."
6.
GDC
50, "Containment Design Basis."
7.
GDC
USNRC Regulatory Guides, SRP Branch Technical Positions
8.3.2
and Appendices
Guide  1.6,  "Independence  Between
A.
Regulatory
Redundant Standby (Onsite) Power Sources and Between Their Dis-
tribution Systems."
B.
Regulatory  Guide 1.9, "Selection, Design, and
Qualification of Diesel-Generator Units Used as Standby (Onsite)
Electric Power Systems at Nuclear Power Plants."
1.32,  "Criteria for Safety-
Guide
C.
Regulatory
Related Electric Power Systems for Nuclear Power Plants."
1.47,  "Bypassed and Inoperable
Regulatory  Guide
D.
Status Indication for Nuclear Power Plant Safety Systems."
1.53,  "Application  of  the
Guide
E.
Regulatory
Single-Failure Criterion to Nuclear Power Plant Protection Sys-
tems."
1.63,  "Electric Penetration
Guide
F.
Regulatory
Assemblies in Containment Structures for Nuclear Power Plants."
8-3