| 2.5.2
USNRC Regulatory Guides, SRP Branch Technical Positions
and Appendices
"Ultimate Heat Sink for
A.
Regulatory
Guide
1.27,
Nuclear Power Plants."
Regulatory Guide 1.28, "Quality Assurance Program
B.
Requirements (Design and Construction)."
Regulatory Guide 1.60, "Design Response Spectra
C.
for Seismic Design of Nuclear Power Plants."
D.
Regulatory Guide 1.132,
"Site Investigations for
Foundations of Nuclear Power Plants."
E.
Regulatory Guide
1.138, "Laboratory Investiga-
tions of Soils for Engineering Analysis and Design of Nuclear
Power Plants."
Regulatory Guide 4.7, "General Site Suitability
F.
Criteria for Nuclear Power Stations."
2.5.3
Codes and Standards
None.
2.5.4
Supplementary Information
A
NUREG-0800,
USNRC "Standard Review Plan," June
1987.
SRP
1.
2.5.1,
"Basic Geologic and Seismic
Information."
2.
SRP 2.5.2,
"Vibratory Ground Motion."
3.
SRP 2.5.3,
"Surface Faulting."
SRP 2 . 5 . 4 ,
"Stability
of
Subsurface
4.
Materials and Foundations."
5.
SRP 2.5.5,
"Stability of Slopes."
B.
NUREG-0625,
"Report of Siting Policy Task Force,"
USNRC, August 1979.
2-11
|