|
| 1.19, "Nondestructive Examina-
Regulatory Guide
D.
tion of Primary Containment Liner Welds."
1.35, "Inservice Inspection of
Regulatory Guide
E.
Ungrouted Tendons in Prestressed Concrete Containment Struc-
tures."
"Concrete Placement in
1.55,
Guide
Regulatory
F.
Category I Structures."
Regulatory Guide 1.57, "Design Limits and Loading
G.
Combinations for Metal Primary Reactor Containment System Com-
ponents."
"Concrete
1.69,
Guide
H.
Regulatory
Shields for Nuclear Power Plants."
Regulatory Guide 1.90, "Inservice Inspection of
I.
Prestressed
Concrete Containment Structures with Grouted
Tendons."
Regulatory Guide 1.91, "Evaluations of Explosions
J.
Postulated to Occur on Transportation Routes Near Nuclear Power
Plants."
1.94, "Quality Assurance
Guide
K.
Regulatory
Requirements for Installation, Inspection, and Testing of Struc-
tural Concrete and Structural Steel During the Construction Phase
of Nuclear Power Plants."
1.103, " P o s t - T e n s i o n e d
Guide
L.
Regulatory
Prestressing Systems for Concrete Reactor Vessels and Contain-
ment."
1.107, "Qualifications for
M.
Regulatory
Guide
Cement Grouting for Prestressing Tendons in Containment Struc-
tures."
1.115, "Protection Against Low
N.
Regulatory Guide
Trajectory Turbine Missiles."
Regulatory Guide 1.136, "Materials, Construction,
O.
and Testing of Concrete Containment."
Regulatory Guide 1.142, "Safety-Related Concrete
P.
Structures for Nuclear Power Plants (Other Than Reactor Vessels
and Containments)."
1.143, "Design Guidance for
Regulatory
Guide
Q.
Radioactive Waste Management Systems, Structures, and Components
Installed in Light-Water-Cooled Nuclear Power Plants."
3-10
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |