|
| 1.53, "Application of the
Guide
Regulatory
F.
Single-Failure Criterion to Nuclear Power Plant Protection Sys-
tems."
1.62, "Manual Initiation of Pro-
Regulatory Guide
G.
tective Actions."
1.63, "Electric Penetration
Guide
H.
Regulatory
Assemblies in Containment Structures for Nuclear Power Plants."
Regulatory Guide 1.68, "Initial Test Programs for
I.
Water-Cooled Nuclear Power Plants."
Regulatory Guide 1.68.3, "Preoperational Testing
J.
of Instrument and Control Air Systems."
1.75, "Physical Independence of
Regulatory
Guide
K.
Electric Systems."
Regulatory Guide 1.80, "Preoperational Testing of
L.
Instrument Air Systems."
(This guide was withdrawn in April
1982, revised, and designated Regulatory Guide 1.68.3, "Preopera-
tional Testing of Instrument and Control Air Systems.")
1.97, "Instrumentation for
M.
Regulatory
Guide
Light-Water-Cooled Nuclear Power Plants to Assess Plant and
Environs Conditions During and Following an Accident."
1.105, "Instrument Setpoints for
Guide
N.
Regulatory
Safety-Related Systems."
O.
"Periodic Testing of
Regulatory
Guide
1.118,
Electric Power and Protection Systems."
"Instrument Sensing
P.
Regulatory
1.151,
Guide
Lines."
Regulatory Guide
1.152, "Criteria for Program-
Q.
mable Digital Computer System Software in Safety-Related Systems
of Nuclear Power Plants."
1.153, "Criteria for Power,
R.
Regulatory Guide
Instrumentation, and Control Portions of Safety Systems."
S.
SRP 7.1,
Appendix A, "Acceptance Criteria and
Guidelines for Instrumentation and Control Systems Important to
Safety."
SRP 7.1, Appendix B, "Guidance for Evaluation of
T.
Conformance to IEEE Std. 279."
7-2
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |