|
| DOESTD-101-92
10 CFR 60.131, "General Design Criteria for the
C.
Geologic Repository Operations Area."
10 CFR 61.12, "Specific Technical Information."
D.
E.
10 CFR 70.23, "Requirements for the Approval of
Applications."
F.
10 CFR 72.120, "General Considerations."
G.
10 CFR 72.122, "Overall Requirements."
3.8.2
Regulatory Guides
A.
Regulatory Guide 3.10, "Liquid Waste Treatment
Design Guide for Plutonium Processing and Fuel Fabrication
Plants."
B.
Regulatory Guide 3.12, "General Design Guide for
Ventilation Systems of Plutonium Processing and Fuel Fabrication
Plants."
C.
Regulatory Guide 3.14, "Seismic Design Classifica-
tion for Plutonium Processing and Fuel Fabrication Plants."
D.
Regulatory Guide 3.16, "General Fire Protection
Guide for Plutonium Processing and Fuel Fabrication Plants."
E.
Regulatory Guide 3.18,
"Confinement Barriers and
Systems for Fuel Reprocessing Plants.
F.
Regulatory Guide 3.20, "Process Offgas Systems for
Fuel Reprocessing Plants."
G.
Regulatory Guide 3.31, "Emergency Water Supply Sys-
tems for Fuel Reprocessing Plants."
H.
Regulatory Guide 3.32, "General Design Guide for
Ventilation Systems for Fuel Reprocessing Plants."
I.
Regulatory Guide 3.37, "Guidance for Avoiding
Intergranular Corrosion and Stress Corrosion in Austenitic Stain-
less Steel Components of Fuel Reprocessing Plants."
J.
Regulatory Guide 3.38,
"General Fire Protection
Guide for Fuel Reprocessing Plants."
Regulatory Guide 3.49, "Design of an Independent
K.
Spent Fuel Storage Installation, (Water Basin Type)."
3-18
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |