|
| COOLANT AREA PRACTICAL FACTORS CARD (contd)
S
P
i
O
e
m
b
r
u
s
f
l
e
o
a
r
r
t
v
m
e
e
Signature
Date
Convert GLASS teletype data into a cu/ml with
conversion factors
X
Start and secure increased argon purge system
X
X
Start up FERD loop
X
X
Start flow through CGCS from primary tank
X
Isolate CGCS from primary tank
X
Start single tag on CGCS
X
Replace filter on PTCGSSS
X
X
Maintain RSCL in hot-standby and bypass modes
X
X
Control primary-tank annulus pressure
X
X
Start continuous tag on CGCS
X
X
Secure continuous tag con CGCS
X
X
Start up the cryo. pumps
X
X
Check the CGCS sump radioisotopic inventory
X
Dump the CGCS sump
X
X
Start argon purge on CGCS
X
X
Simulate operation of reactor building MET-L-X system
X
Simulate operation of SBB MET-L-X systems
X
Reduce pressure control of primary cover gas
X
X
Reduce pressure control of secondary cover gas
X
X
Reset primary-purification ventilation inlet dampers
X
Adjust thimble-cooling dampers for proper operation
X
Adjust shield-exhaust dampers for proper operation
X
Cross-connect thimble cooling to shield-cooling exhaust
X
Place primary purification system in hot standby
X
X
Operate primary-purification NaK dump system
(dump & fill)
XX
Start up and shut down primary auxiliary pump
XX
Manually operate shut down cooler dampers
XX
Demonstrate how to operate the following radiation-
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
monitoring equipment:
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
a. High-range beta-gamma portable survey instrument
X
b. Intermediate-range beta-gamma portable survey
instrument
X
c. Low-range beta-gamma portable survey instrument
X
d. Alpha meter
X
e. Hand and foot monitors
X
Demonstrate how to decontaminate the following:
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
a. Hands
X
b. Shoes
X
c. Tools
X
d. Flat surfaces
X
Don and remove a set of full anticontamination clothing
X
Demonstrate how to properly enter and leave a
controlled boundary
X
B-4
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |