Click here to make tpub.com your Home Page

Page Title: Preparation of the Final NPH Performance Category List
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



DOE-STD-1021-93
systems (the storage of flashlights and walkie-talkies could become an NPH design
consideration), and any water or steam lines whose seismic failure would be hazardous to the
operator.
3.10 Preparation of the Final NPH Performance Category List
After the NPH performance categorization has been performed as outlined above, the resulting
documentation should be catalogued, numbered, design reviewed, and entered into the document
control process so that the quality assurance and applicable independent peer review requirements are
satisfied. The results of the categorization should then be recorded in a component performance
category list.
In this list, components of a facility should be listed system-by-system and then category-by-category
(except PC-0 components). Both the component name and a unique component number should be
listed, along with the identification of the reference document which provides the categorization
rationale. If a component is part of more than one system, a note should be provided at the bottom of
the table identifying the other systems of which it is a part. The list should also indicate the
component function number, signifying the criterion that was the basis for selecting the performance
category.
As discussed in Subsection 3.6, it is recommended that, when many non-safety components belonging
to one performance category can be lumped into one group based on common NPH-related
characteristics or location, they be entered into this list with a single entry, unless any such component
performs a unique mission-important function.
The final list should be design reviewed and entered into the document control process as a controlled
design document with the appropriate revision number. This list should be a living document and
should be updated periodically to reflect changes in the plant design that would potentially change the
component performance categories. All such changes should be coordinated and approved by the
facility Performance Categorization Engineer.
3-13


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business