|
| DOE-STD-1050-93
A PPEN D IX F
EXAMPLE TROUBLESHOOTING GUIDE
g. Steps to record the identification numbers and calibration due dates of measuring and
test equipment used (see DOE "Guidelines to Good Practices f or Control and
Calibration of M easuring and T est Equipm ent (M &T E) at DOE N uclear Facilities."
h. Steps to tag and retain all parts removed during the troubleshooting process. These
parts shall be retained as appropriate for further investigation/analysis by maintenance
or sy stems engineer.
3.
For troubleshooting of safety-related equipment, or equipment important to safe and
reliable plant operation, a troubleshooting impact statement should be included as part of
the planned package. Include the following information on the statement:
a. scope of the troubleshooting
b. required equipment status
c. work boundaries for the activity
d. potential plant upsets that may occur
e. approval of owner/operator supervision prior to beginning troubleshooting activities
Any follow-up corrective maintenance deemed necessary as a result of troubleshooting
4.
should be performed under a separate corrective maintenance work order or under an
approved revision to the work plan.
F-4
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |