|
| DOE-STD-1051-93
A.7 PREVENTIVE MAINTENANCE
PERFORMANCE OBJECTIVE
Preventive maintenance should contribute to optimum performance and reliability
of plant sy stems and equipment.
CRITERIA
A. A preventive maintenance program is effectively implemented and includes
sy stems and equipment that affect safe and reliable plant operation. Preventive
maintenance includes equipment layup protective measures, where applicable.
B. Preventive maintenance, including predictive maintenance activities, are
performed at appropriate intervals. These intervals maximize equipment
availability. Considerations such as operational experience, vendor
recommendations, engineering analysis, and cost/benefit analysis are used as a
basis to establish preventive maintenance tasks and intervals.
C. Preventive maintenance activities are scheduled and performed within
established intervals. Preventive maintenance is waived or deferred only with
management approval.
D. Preventive maintenance documentation provides a record of activities performed,
data collected, and, where appropriate, the "as-found" and "as-left" condition of
the equipment.
E. Preventive maintenance techniques and results are used to assess equipment
performance. Program adjustments are made and other corrective actions are
taken where needed.
F. The effectiveness of the preventive maintenance program is periodically
evaluated at an appropriate level of management, and the results are used to
make program improvements.
A-12
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |