|
| DOE-STD-1052-93
commitments associated with the component
cost of repair
mean-time-between-failures
input from vendors and other supplier programs (e.g., technical bulletins and
notices)
A list of all FCE should be compiled, this list should be useful in assigning priorities
and should provide a mechanism for tracking and documenting the status of
subsequent analysis.
7.7.1
Instrument Matrix
This section describes a method of identifying functionally critical
instruments. A system may contain hundreds of instruments and the analysis
of these instruments may be a formidable task. Many instruments perform
important system functions that should be preserved by a PM task. However,
some of these functions may not be identified during an analysis of system
functions or during development of a FMEA on FCE that has associated
instruments. To assist in identifying functionally critical instruments, a matrix
should be developed and used to identify the functions of the instrument and
their importance in maintaining system functions. This technique of using a
matrix has proven to be successful for evaluating instruments and provides
a good checklist to ensure that all functions of the instrument are identified
for analysis.
7.7.1.1
All instruments contained in the system should be listed on a
matrix containing an instrument function. The functions to be
listed on the matrix are listed below:
F I - provides a component, system, or plant trip function
F 2 - provides automatic control or interlock
F 3 - safety-related display instrumentation (e.g., as defined in
technical safety requirements and the FSAR)
F 4 - supports technical safety requirements
F 5 - provides alarm, indication, or recorder information to the
control room
D - 26
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |