Click here to make tpub.com your Home Page

Page Title: Instrument Matrix
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



DOE-STD-1052-93
commitments associated with the component
cost of repair
mean-time-between-failures
input from vendors and other supplier programs (e.g., technical bulletins and
notices)
A list of all FCE should be compiled, this list should be useful in assigning priorities
and should provide a mechanism for tracking and documenting the status of
subsequent analysis.
7.7.1
Instrument Matrix
This section describes a method of identifying functionally critical
instruments. A system may contain hundreds of instruments and the analysis
of these instruments may be a formidable task. Many instruments perform
important system functions that should be preserved by a PM task. However,
some of these functions may not be identified during an analysis of system
functions or during development of a FMEA on FCE that has associated
instruments. To assist in identifying functionally critical instruments, a matrix
should be developed and used to identify the functions of the instrument and
their importance in maintaining system functions. This technique of using a
matrix has proven to be successful for evaluating instruments and provides
a good checklist to ensure that all functions of the instrument are identified
for analysis.
7.7.1.1
All instruments contained in the system should be listed on a
matrix containing an instrument function. The functions to be
listed on the matrix are listed below:
F I - provides a component, system, or plant trip function
F 2 - provides automatic control or interlock
F 3 - safety-related display instrumentation (e.g., as defined in
technical safety requirements and the FSAR)
F 4 - supports technical safety requirements
F 5 - provides alarm, indication, or recorder information to the
control room
D - 26


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business