| DOE-STD-1052-93
3.4.3.7
PM Program Improvement
Using the results of the PM program evaluation presented in Section
3.4.3.6, the following improvements should be addressed and
implemented as appropriate:
a) adjustment of PM task interval
b) redefinition of PM activities
c) addition or deletion of PM activities
d) adjustment of spare parts stocking levels
e) propose design changes
f) identification of special tools
g) revised PM program and/or PM task procedures
h) replacement of cost/labor intensive items
NOTE:
Appendix D contains an enhanced PM program
which may be used for the development or revision
of plant specific PM programs.
3.4.4 Predictive Maintenance
3.4.4.1
Predictive maintenance should be integrated into the overall preventive
maintenance program so that "just-in-time" planned maintenance may be
performed prior to equipment failure. Not all equipment conditions and
failure modes can be monitored; therefore, predictive maintenance should
be selectively applied. Reliable predictive maintenance is normally
preferable to periodic internal, inspection or equipment overhauls. In
addition, corrective maintenance efficiency may be improved by directing
repair efforts (manpower, tooling, parts) at problems detected using
predictive maintenance techniques.