Task and Program Review
To gain the maximum benefit from the enhancement effort, appropriate review,
feedback, and update processes need to be incorporated into the PM program to
ensure that the program effectively addresses changing plant and equipment
conditions. These processes should be routine functions of appropriate organizations.
Evaluation of data from the following sources and implementation of appropriate
adjustments need to be performed to maintain the effectiveness of the PM program:
equipment failure trending
root cause analysis of component failures resulting in plant events
craft feedback reports
predictive maintenance analysis
plant and system performance monitoring
preventive and corrective maintenance history
surveillance test optimization studies
radiation exposure history of PM performances
equipment design modifications
During the evaluation of the data from the sources listed above, the following items
should be considered:
equipment failure characteristics (e.g., failure rates, causes, and mechanisms)
to validate FMEAs
as-found equipment conditions and task intervals
installation of new equipment for program scope changes
operating and maintenance procedure changes for PM task content changes
plant effects caused by failure of noncritical components