Click here to make tpub.com your Home Page

Page Title: Appendix D: Gross Serror Report - Continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



DOE-STD-1054-93
A PPEN D IX D
GROS S ERROR REPORT
FORM NO.
Plant
Facility Name
Instrument #
SR#
Manufacturer
Model #
Calibration Date
Previous Calibration Date
Ranges Affected
% Error
Ranges Affected
% Error
This instrument was involved in activities associated with the attached list of equipment
and/or jobs. Based on a review of the out-of-calibration condition and the affected list of
equipment, the checked action is required.
No Action Required:
instrument was not used during period (no list)
affected range(s) was not used
the error did not cause any test result/calibration to exceed equipment
allowable tolerances.
instrument would not function and failure time and cause were known,
providing reasonable assurance that the instrument was in calibration
prior to failure
other
D-3


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business