| DOE-STD-1061-93
Enabling
Learning
Objectives
Suggested Learning Activities:
12.1, 12.3
Discuss with the manager, who is knowledgeable of the entire
modification process: the key steps, and the reasons for the steps in the
modification process; authority of the shift supervisor; basis for this
authority; and the associated responsibilities of the shift supervisor as
seen by facility, design engineering, and construction managers.
12.2, 12.4, 12.5
Use a case-study approach to a modification that includes evaluation of
potential problems with the design, facility limitations during work, and
how to determine the effects of the modification on facility operation.
Enabling
Learning
Objectives
Suggested Evaluation Activities:
12.1, 12.3
Conduct a qualitative evaluation of trainee responses and discussions.
12.2, 12.4, 12.5
Review responses derived by trainees during the case study.