| DOE-STD-1070-94
APPENDIX
1.5
Training developed and/or implemented by personnel or organizations other
than the operating contractor's staff is monitored and controlled to ensure that
it meets applicable facility requirements.
Training provided by an outside organization (e.g., sub-contractor, vendor, site
central training) in support of the qualification or certification of facility personnel
meets the same basic requirements for development, implementation, testing, and
documentation as training provided by the facility staff.
1.6
Training facilities, equipment, and materials effectively support training activities.
Adequate facilities are available to support safe and consistent training. Sufficient
facilities and proper tools, equipment, and materials are available to support
applicable training content and performance activities (e.g., hands-on training for
maintenance personnel and technicians). Instructional support materials and
equipment such as audio-visual equipment, flip charts, and marker boards are
adequate to support the training activities. In addition to facilities to support the
implementation of training, staff facilities and equipment are available to support
analysis, design, development, and evaluation of training. Technical reference
materials such as procedures, technical manuals, and drawings are readily available
to instructors and trainees on all shifts.