| DOE-S T D-1180-2004
f.
Evaluate scaffolding and temporary work platform arrangements for structural integrity
and stability.
g. Walkthrough a structure with exposed structural steel and discuss the applicable
construction methods and practices associated with the structural steel.
37.
Construction Management personnel shall demonstrate a working level
knowledge of electrical equipment installation methods and National Electrical
Code (NEC) requirements.
Supporting Knowledge and/or Skills
a. Discuss the classification of electric cable.
b. Determine the requirements in the National Electrical Code (NEC) for the installation of
electrical equipment under a given set of conditions.
c. Describe the construction methods, equipment, and components used to install
electrical distribution systems.
d. During a facility walkthrough describe the NEC requirements for the facility and
construction activities to install the electrical equipment.
MANAGEMENT, ASSESSMENT, AND OVERSIGHT
38.
Construction Management personnel shall demonstrate a working level
knowledge of project management principles and the methods used to ensure that
contractor resources are applied to meet quality, safety, technical, cost, and
schedule commitments.
Supporting Knowledge and/or Skills
a. Explain the purpose of project management, and describe the life cycle of a typical
project.
b. Describe the primary roles and responsibilities of construction management and
engineering personnel.
c. Describe typical documents and data sources used in Project Management.
d. Identify, explain, and discuss the relationship of the major elements of a project.
e. Explain the purpose and use of a Project Execution Plan.
25
|