DOE-STD-3006-95
5.0 DETAILED GUIDANCE
5.1 Roles and Requirements for Contractor Operational Readiness Review. Most responsible
contractors have developed procedures to manage the readiness process. This section is intended to
describe the recommended content and attributes of an ORR program and organization. It is
anticipated that most contractors will require only minimum modifications to their procedures to
achieve the intent of this standard and meet the requirements of DOE 0 425.1, Attachment 1,
"Contractor Requirements Document."
5.1.1 Summary of Contractor Operational Readiness Review (ORR) Process.
The contractor ORR shall focus on the readiness of all hardware, personnel, procedures, and
compliance with the applicable requirements.
a. The purpose of the contractor's ORR is to verify that nuclear facilities being started up or
restarted:
o
Are constructed in accordance with the approved design;
o
Can be operated safely;
o
Will be operated, maintained, and supported by trained and competent personnel;
o
Are designed and will be operated in conformance with applicable DOE Orders and
regulatory requirements;
o
Will be operated so that no undue risk to employees, the public, or the environment results;
and
o
All of the above items are properly and adequately documented.
b. The foundation for readiness of the nuclear facility is an approved safety basis as defined in
approved facility safety documentation, approved environmental documentation, a satisfactory safe
working environment, and compliance with DOE Orders and requirements. The ORR must verify
that necessary approved requirements documentation is in place and that procedures, personnel,
equipment, and systems support the approved requirements. It is not the responsibility of the ORR
to approve the foundation documentation -- only to verify that it is complete, approved, and
implemented as required by core requirements of DOE 0 425.1. Critical to a determination of
compliance with DOE Orders and requirements is the Order Compliance effort which encompasses
23