|
| GASLIQUIFIED
HORIZONTAL
SCENARIO 4
UNDERPRESSURE
JET
GO TO SECTIONS 6.2
THROUGH 6.4
OF REFERENCE 6
SCENARIO 5
GASLIQUIFIED
VERTICAL
UNDERPRESSURE
GO TO SECTIONS 6.2
JET-UP
TEMPERATURE
THROUGH 6.4
WELL ABOVE
OF REFERENCE 6
BOILING POINT
(MORE THAN TEN
DEGREES
CENTRIGRADE)
SCENARIO 6
VERTICAL
GASLIQUIFIED
UNDERPRESSURE
JET-DOWN
GO TO SECTION 6.5.1
OF REFERENCE 6
SCENARIO 7
GASLIQUIFIED
CATASTROPHIC
UNDERPRESSURE
FAILURE
GO TO SECTION 8.0
PRESSURIZED
FROM
OF REFERENCE 6
LIQUID
PAGE C
RELEASE
D-7
SEEK
EXPERT
OTHER
ADVICE
TEMPERATURE JUST
ABOVE BOILING
SEEK
GO TO SECTION 6.5.2
POINT(LESS THAN
EXPERT
OF REFERENCE 6
TEN DEGREES
ADVICE (1)
CENTIGRADE)
(1) Expert advice needed on aerosolization
FIGURE D-1. Scenario identification flowchart (continued)
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |