Click here to make tpub.com your Home Page

Page Title: Appendix G: Sample Operations Assessment Report - Continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



DOE-EM-STD-5505-96
APPENDIX G
SAMPLE OPERATIONS ASSESSMENT REPORT
4. Safe condition checks are not consistently performed in accordance with approved Company
procedures. However, no immediate hazard to personnel safety was identified during the review.
RADIOLOGICAL CONTROL
5. Fundamental contamination control practices need significant improvement. This concern
applies to both workers and radiological control technicians.
6. The Radiological Problem Reporting (RPR) program is not effective at identifying and
correcting radiological deficiencies.
7. Radiological surveys taken by Radiological Control Technicians are inadequate because the
results of the surveys are not available until after the work is completed, in process contamination
surveys are not taken, and radiological hold points are not incorporated into work procedures.
8. Radioactive material is not properly controlled because radioactive material is stored outside
radioactive material storage areas, not properly marked or labeled, and not enclosed in yellow
poly bags.
146


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business