|
| DOE-EM-STD-5505-96
APPENDIX G
SAMPLE OPERATIONS ASSESSMENT REPORT
FINDING:
Installed temporary shielding on a pipe in C-Farm was not properly marked.
[Concern: 6]
DISCUSSION: A pipe in the C-Farm has shielding chained and locked in place. The
shielding is not marked in accordance with Article 314.5.
FINDING:
Barrier tape and rope used for two radiological areas were not yellow and magenta in color.
(Reference: 1) [Concern: 6]
DISCUSSION: Construction "Caution" tape was used as a barrier tape for the temporary
airborne radioactivity area established for DCRT cover block removal at X Tank Farm on
7/18/95.
Yellow rope was used as a barrier for the underground radioactive material area adjacent to
the entrance trailer for the Y Tank Farm.
FINDING:
Three radiological areas within C-Farm were posted with out of date signs that do not meet
reference 1 specifications.
(Reference: 1) [Concern: 6]
DISCUSSION: An out of date High Radiation Area sign was posted on a shielded pipe.
An Airborne Radioactivity/Radiation Area inside a tent was posted with out of date Airborne
Radioactivity signs.
A High Contamination/Radiation Area was posted with a mixture of out of date signs and
new signs. The old signs do not specify entry requirements.
166
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |