| DOE-TSL-1- 2002
APPENDIX D
CANCELED DOE STANDARDS
DATE
DOCUMENT NO.
TITLE
CANCELED
REASON
NE M 14- 1T
Sodium Cover Gas--Purchase
07/96 No longer needed
Specifications (w/Amendment 1) (1/75)
NE M 14- 2T
Fuel and Control Assembly Tag Gas (1/86)
07/96 No longer needed
NE M 16- 1T
Gas-Phase Adsorbents for Trapping
07/96 No longer needed
Radioactive Iodine and Iodine Compounds
(10/81)
07/85 Replaced by DOE(NE)
NE M 16- 3T
HEPA Filter Medium, Glass Fiber (MIL-F-
F3-45 and MIL-F-
51079 with Modifications and Additional
51079C-80
Requirements) (3/74)
NE M 17- 1T
Sodium Carbonate, Low-Chloride Fire
07/96 No longer needed
Extinguishing Agent (w/Amendment 1) (6/84)
NE P 2- 5T
Medium Voltage Switchgear (10/75)
01/79 No longer needed
NE P 2- 6T
Undervoltage Relay for Plant Protection
05/75 No longer needed
System Use (12/72)
NE P 3- 1T
Electric Penetration Assemblies in
07/96 No longer needed
Containment Structures (IEEE 317 with
Additional Requirements) (1/79)
07/96 No longer needed
NE P 4- 1T
Electric Heaters--Simulated LMFBR Fuel
Pins (3/72)
NE P 4- 3T
Metal-Sheathed, Mineral-Insulated Electric
07/96 No longer needed
Resistance Heaters (3/75)
NE P 4- 4T
Electric Heaters--Simulated Pressurized
09/75 No longer needed
Water Reactor Fuel Pins (2/73)
D-23
|