Click here to make tpub.com your Home Page

Page Title: Appendix D: Canceled DOE Standards - Continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



DOE-TSL-1- 2002
APPENDIX D
CANCELED DOE STANDARDS
DATE
DOCUMENT NO.
TITLE
CANCELED
REASON
DOE-TSL-1-97
Department of Energy Standards Index
05/98 Replaced by DOE-TSL-1-
98
DOE-TSL-1-98
Department of Energy Standards Index
05/99 Replaced by DOE-TSL-1-
99
DOE-TSL-1-99
Department of Energy Standards Index
12/02 Superseded by DOE-
TSL-1-2002.
DOE-TSL-2-93
Directory of Points of Contact for the DOE
02/98 Replaced by DOE-TSL-2-
Technical Standards Program
98
DOE-TSL-2-98
Directory of Points of Contact for the DOE
08/02 Superseded by DOE-
Technical Standards Program
TSL-2-2002.
DOE-TSL-4-94
Director of DOE Employees and Contractor
09/94 Replaced by DOE-TSL-4-
Personnel Involved in Non-Government
94A
Standards Activities
DOE-TSL-4-94A
Directory of DOE Employees and Contractor
08/95 Replaced by DOE-TSL-4-
Personnel Involved in Non-Government
95
Standards Activities (revision 1)
DOE-TSL-4-95
Directory of DOE Employees and Contractor
10/96 Replaced by DOE-TSL-4-
Personnel involved in Non-Government
96
Standards Activities
DOE-TSL-4-96
Directory of DOE and Contractor Personnel
07/97 Replaced by DOE-TSL-4-
Involved in Non-Government Standards
97
Activities
DOE-TSL-4-97
Directory of DOE and Contractor Personnel
05/98 Replaced by DOE-TSL-4-
Involved in Non-Government Standards
98
Activities
DOE-TSL-4-98
Directory of DOE and Contractor Personnel
05/99 Replaced by DOE-TSL-4-
Involved in Non-Government Standards
99
Activities
NE A 1- 1T
Coolant Composition in Pressurized Water
07/96 No longer needed
Reactors (3/81)
NE A 1- 5T
Purity Requirements for Operating Sodium
07/96 No longer needed
Reactor Systems (6/81)
NE C 1- 1T
Instrumentation and Control Equipment
07/96 No longer needed
Grounding and Shielding Practices
(w/Amendment 1) (1/75)
09/91 Replaced by ASTM
NE C 1- 2T
Recommended Practice for High-
E1319-89
Temperature Strain Measurement (10/85)
NE C 2- 1T
Determination of Insulation Compaction in
07/96 No longer needed
Ceramic Insulated Conductors
(w/Amendment 1) (9/73)
07/96 No longer needed
NE C 2- 3T
Time Response Test for Sheathed, Mineral
Insulated Thermocouple Assembly (6/72)
NE C 4- 1T
Orifice Plate for Orifice Flange Union (1/71)
05/73 No longer needed
D-5


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business