Click here to make tpub.com your Home Page

Page Title: Appendix C: Others Standards-Related Documents - Continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



DOE-TSL-1-2007
APPENDIX C
OTHER STANDARDS-RELATED DOCUMENTS
DOCUMENT NO.
TITLE
NRC RG 3.12
General Design Guide for Ventilation Systems of Plutonium
Processing and Fuel Fabrication Plants
NRC RG 3.14
Seismic Design Classification for Plutonium Processing and
Fuel Fabrication Plants
NRC RG 3.17
Earthquake Instrumentation for Fuel Reprocessing Plants
NRC RG 3.18
Confinement Barriers and Systems for Fuel Reprocessing
NRC RG 3.20
Process Off-Gas Systems for Fuel Reprocessing Plants
NRC RG 3.22
Periodic Testing of Fuel Reprocessing Plant-Protection
System Actuation Functions
NRC RG 3.26
Standard Format and Content of Safety Analysis Reports
for Fuel Reprocessing Plants
NRC RG 3.27
Nondestructive Examination of Welds in the Liners of
Concrete Barriers in Fuel Reprocessing Plants
NRC RG 3.32
General Design Guide for Ventilation Systems for Fuel
Processing Plants
NRC RG 3.33
Assumptions Used for Evaluating the Potential Radiological
Consequences of Accidental Nuclear Criticality in a Fuel
Reprocessing Plant
NRC RG 3.34
Assumptions Used for Evaluating the Potential Radiological
Consequences of Accidental Nuclear Criticality in a Uranium
Fuel Fabrication Plant
NRC RG 3.35
Assumptions Used for Evaluating the Potential Radiological
Consequences of Accidental Nuclear Criticality in a
Plutonium Processing and Fuel Fabrication Plant
NRC RG 3.43
Nuclear Criticality Safety in the Storage of Fissile Materials
NRC RG 3.49
Design of an Independent (Water Basin Type) Spent Fuel
Storage Installation
NRC RG 3.54
Spent Fuel Heat Generation in an Independent Spent Fuel
Storage Installation
NRC RG 4.15
Quality Assurance for Radiological Monitoring Programs
(Normal Operations)--Effluent Streams and the
NRC RG 7.10
Establishing Quality Assurance Programs for Packaging
NRC RG 7.11
Fracture Toughness Criteria of Base Material for Ferritic
Steel Shipping Cask Containment Vessels with a Maximum
Wall Thickness of 4 Inches
NRC RG 7.12
Fracture Toughness Criteria of Base Material for Ferritic
Steel Shipping Cask Containment Vessels with a Wall
Thickness Greater Than 4 Inches But Not Exceeding 12
NRC RG 7.6
Design Criteria for the Structural Analysis of Shipping Cask
Containment Vessels, Rev. 1
NRC RG 7.8
Load Combinations for the Structural Analysis of Shipping
Casks for Radioactive Material, Rev. 1
C-16


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business