Click here to make tpub.com your Home Page

Page Title: Appendix D: Canceled DOE Standards - Continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



DOE-TSL-1-2007
APPENDIX D
CANCELED DOE STANDARDS
DATE
DOCUMENT
TITLE
CANCELED
REASON
NE E 5- 2T
Electric Heater and Connector Assembly
07/96 No longer needed
for Pressurizer for Pressurized Water
Reactors (5/72)
NE E 6- 1T
Near-Isotropic Petroleum-Coke Based
07/96 No longer needed
Graphites for High Temperature Gas-
Cooled Reactor Core Components
NE E 6- 5T
Collapsible-Rotor, Roller-Nut Control Rod
07/96 No longer needed
Drive Mechanism for Sodium Service
(w/Amendments 1, 2, and 3) (9/74)
NE E 6- 9T
Core Support Structure for Pressurized
02/75 No longer needed
Water Reactors (Fabrication Only) (4/72)
NE E 6-10T
Temperature and Liquid Level Control
10/76 No longer needed
Monitor, Port Plug (Fabrication Only)
NE E 6-11T
Simulated Core Assemblies for Nuclear
10/76 No longer needed
Reactors (3/73)
NE E 6-13T
Core Support Structure for Sodium
10/76 No longer needed
Cooled Reactors (Fabrication Only) (1/72)
NE E 6-17T
Core Restraint Mechanism for Sodium
10/76 No longer needed
Cooled Reactors (Fabrication Only)
NE E 6-18T
Instrument Tree for Sodium Cooled
10/76 No longer needed
Reactors (Fabrication Only) (2/73)
NE E 6-19T
Radial Reflector Assembly for Liquid
07/96 No longer needed
Metal Fast Breeder Reactors (3/78)
NE E 6-23T
Core Radial Shield for Sodium Cooled
10/76 No longer needed
Reactors (12/71)
NE E 6-24T
Interim Decay Storage for Sodium-
07/80 No longer needed
Cooled Reactors (4/73)
NE E 6-25T
Control Rod Absorber Pin for Liquid Metal
07/96 No longer needed
Fast Breeder Reactors (w/Amendment 1)
(1/77)
NE E 6-26T
Fabrication of Control Rod Driveline for
10/76 No longer needed
Sodium Cooled Reactors (4/73)
NE E 6-30T
Absorber Pin Boron Carbide Pellet (9/76)
07/96 No longer needed
NE E 6-33T
Control Rod Assembly for Liquid Metal
07/96 No longer needed
Fast Breeder Reactors (w/Amendment 1)
NE E 6-34T
Fabrication of Core Component Pot for
10/76 No longer needed
Liquid Metal Service (3/72)
NE E 6-36T
Low Level Flux Monitor Mechanical
10/76 No longer needed
System for Liquid Metal Service
(Fabrication Only) (7/72)
NE E 6-38T
Low Friction Hard Surfaces for Core
07/96 No longer needed
Components (w/Amendment 1) (9/73)
D-11


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business