Click here to make tpub.com your Home Page

Page Title: Setup for Mock Exercise
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



Radiological Assessor Training
DOE-HDBK-1141-2001
Instructor's Guide
Setup for Mock Exercise
Radiological Work Site
Mockup Demonstration
Checklist for Module 11
(continued)
Complete the following tasks prior to the implementation of
the mock-up exercise:
θ Install PVC containment supports, pipe with valve and
glove bag.
θ Place a tear in one finger of a glove attached to a glove
bag (large enough to stick a finger through).
θ Open both isolation (green-handled) valves.
θ Prepare a "hot spot" label and write "500 mrem/hr" on
the label.
θ Stick label onto mock hot spot and place yellow lead
blanket over it.
θ String yellow and magenta poly rope through stanchions
to establish mock radiological area.
θ Place defective signs (wrong color or wording) onto the
rope; for example, "Radiation Zone."
θ Place poly bottle in background (5 ft behind containment
supports).
θ Place a yellow plastic waste bag just outside the
radiological area.
θ Prepare RWP for this job showing High Radiation Area,
Radiological Buffer Area, thermoluminescent
dosimeters (TLDs) and pocket dosimeters, continuous
Radiological Control Technician coverage, and pre-job
briefing required (instructor reviews with the class
members in an earlier session).
θ Brief players before mock exercise (see Module 11 of
Instructor's Guide).
θ Dress players (include "maternity padding" for DOE
Representative).
θ Paint simulated cut on right hand of Worker 2.
Module 11 4


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business