| DOE-STD-1073-2003
Configuration Management
5.10 Improvement
If a significant change needs to be made to the facility or activity because of a deficiency
in the design process, the design process should be reviewed and corrected to prevent
reoccurrence of the problem.
5.11 Baseline Change Control
Contractors should refer to their contracts and Chapter II of DOE O 413.3 for possible
requirements related to changes to project and capital assets.