DOE-STD-1120-2005/Vol. 2
29 CFR 1910.147 *
Covers the servicing and maintenance of machines and equipment in which
Physical
Other
Control of Hazardous Energy
the unexpected energization or startup of the machines or equipment or the
Physical
(Lockout/Tagout)
release of stored energy could cause injury to employees. Minimum
Hazards
performance requirements for the control of such hazardous energy are
established. It does not cover construction employment or exposure to
electrical hazards in electric utilization installations.
29 CFR 1910 Subpart N *
Contains safety requirements for mechanized materials handling and storage.
Materials Handling and Storage
29 CFR 1926 Subpart N *
Covers the use, employee protection and hazard control, maintenance,
Cranes, Derricks, Hoists, Elevators, and
testing, and equipment associated with cranes, derricks, hoists, elevators, and
Conveyors
conveyors used for construction.
DOE-STD-1090-04
Provides guidance for safely performing hoisting and rigging activities.
Hoisting and Rigging
29 CFR 1926 Subpart O *
Addresses safety requirements related to off-highway motor vehicles,
Motor Vehicles, Mechanized Equipment,
earthmoving equipment, excavating and other equipment, pile driving
and Marine Operations
equipment, site clearing, and marine operations and equipment.
29 CFR 1926 Subpart P *
Primarily applicable only during decommissioning. Contains requirements
for the protection of employees working in and around all open excavations
(including trenches) and requirements for protective systems (e.g., sloping,
shield systems, etc.).
29 CFR 1926 Subpart T *
Primarily applicable only during decommissioning. Contains requirements
Demolition
for demolition preparatory operations, floor, wall, material, and steel
construction removal, waste transport, and storage. It does not include
demolition by explosives, which is in Subpart U.
A-21