| DOE-STD-1136-2004
Guide of Good Practices for Occupational Radiation Protection in Uranium Facilities
10.2.4 Soil-Contamination Considerations
Depending on the activity levels found, locations where contaminated effluents have penetrated the
ground may require excavation during decommissioning. The facility design should minimize such areas.
Particular attention should be paid to storm runoff from roofs, storage areas, contaminated equipment
storage, and liquid waste treatment impoundments (including sanitary sewage systems if they may receive
some small amount of contamination during the life of the facility).
10.2.5 Other Features
Installed decontamination and materials-handling equipment that facilitates operation and
maintenance also generally facilitates decommissioning in two ways. First, it can be used for its intended
purposes of cle aning and moving equipment during the decommissioning phase. Even more important, it
usually contributes to a cleaner, better-maintained facility, where nonfunctional equipment is moved out
when it is no longer needed and work surfaces are kept free of spreadable contamination.
Other features include the following:
a. minimizing service piping, conduits, and ductwork,
b. caulking or sealing all cracks, crevices, and joints,
contamination of fixed portions of the structure,
d. using localized liquid transfer systems that avoid long runs of buried contaminated piping,
e. using equipment that precludes the accumulation of radioactive or other hazardous materials in
relatively inaccessible areas, including curves and turns in piping and ductwork,
f.
using designs that ease cut-up, dismantling, removal, and packaging of contaminated equipment
from the facility,
g. using modular radiation shielding, in lieu of or in addition to monolithic shielding walls,
h. using lifting lugs on large tanks and equipment, and
i.
using fully drainable piping systems that carry contaminated or potentially contaminated liquids.
10.3 DECONTAMINATION AND DECOMMISSIONING PROGRAM REQUIREMENTS
The basic requirements for a D&D program at a DOE facility are found in Section 5 of
DOE O 435.1, Ch.1, Radioactive Waste Management. Planning for facility decommissioning shall be
initiated during the design phase for new facilities and before termination of operations for existing
operational facilities. DOE O 435.1, Ch.1, divides the discussion of requirements into several time periods:
pre-operational and operational activities, post-operational activities, D&D activities, and post-
decommissioning activities. Requirements for each of these time periods and for quality assurance are
presented in the following sections.
10-7
|