|
| DOE-HDBK-3012-96
*
Functional description for environmental, safety, and health (ES&H) organizations (NQA-1).
*
General site map.
-
Contractor ORR and/or Management Self Assessment reports.
-
The Tiger Team/TSA Action Plan(s) and the most recent Status Report for the Tiger Team
Assessment.
- A list of functional review reports issued within the last 12 months by DOE- [ Field Office]
regarding [Site] (DOE 5482.1).
- All DNFSB, EH, NS, IG, EPA, OSHA reports issued within the last 12 months.
- The most recent contractor triennial management review (required per DOE 5480.5) of the
internal safety review system.
- Site Development Plan (ref. 4300.1).
- Annual Site Environmental Reports; the most recent, even if in draft form, and the preceding
year (ref. 5400.1 Ch. II).
- Environmental Monitoring Plan and it's associated Meteorological Information/Monitoring
Program (ref. 5400.1 Ch. IV).
- Spill Prevention, Control and Countermeasures Contingency Plans (if applicable).
- Inventory of hazardous chemicals (those above Threshold Planning Quantities per SARA Title
III) by room, area, or building, as appropriate to planning walkthroughs. (Remove portions
that are classified).
- SARA Title III Tier One and Two reports.
- Most recent site-wide EIS and/or EA.
- National Emission Standards for Hazardous Air Pollutants (NESHAP) report (if applicable).
- All Type A accident investigations reports for the last two years.
- OSHA 200 log from past two years.
- Site Radiation Control Manual and associated implementation plan.
- DOE and Contractor Quality Assurance Program Manual.
- List of Quality Assurance plans and implementation procedures.
- DOE and Contractor Conduct of Operations Manual.
- List of Conduct of Operations plans and implementation procedures.
- Operator training program documentation.
- List of ES&H policies and procedures of the Field Office and Contractor.
- Contractor's ES&H Manual.
* List of applicable Technical Safety Requirements.
* Applicable Safety Analysis Report(s).
- Site-specific Explosives Safety Manual (if applicable).
- Explosives Safety Policy Statements (if applicable).
- Explosives Handling, Storage, and Disposal facility Design Bases/SARs (if applicable).
- Site Fire Protection Manual.
- Site Pre-fire Plans.
- All Fire Department Procedures.
- Fire Protection staff organization charts and job descriptions.
- Staffing plans and any analyses relating to staffing for the past 12 months.
- Applicable DOE Order Compliance Documents and Compliance Schedule Agreements.
- Site Emergency Plans
APPENDIX 3-2
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |