Click here to make tpub.com your Home Page

Page Title: Appendix 3 Operational Readiness Review Logistics cont'd
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



DOE-HDBK-3012-96
*
Functional description for environmental, safety, and health (ES&H) organizations (NQA-1).
*
General site map.
-
Contractor ORR and/or Management Self Assessment reports.
-
The Tiger Team/TSA Action Plan(s) and the most recent Status Report for the Tiger Team
Assessment.
- A list of functional review reports issued within the last 12 months by DOE- [ Field Office]
regarding  [Site]  (DOE 5482.1).
- All DNFSB, EH, NS, IG, EPA, OSHA reports issued within the last 12 months.
- The most recent contractor triennial management review (required per DOE 5480.5) of the
internal safety review system.
- Site Development Plan (ref. 4300.1).
- Annual Site Environmental Reports; the most recent, even if in draft form, and the preceding
year (ref. 5400.1 Ch. II).
- Environmental Monitoring Plan and it's associated Meteorological Information/Monitoring
Program (ref. 5400.1 Ch. IV).
- Spill Prevention, Control and Countermeasures Contingency Plans (if applicable).
- Inventory of hazardous chemicals (those above Threshold Planning Quantities per SARA Title
III) by room, area, or building, as appropriate to planning walkthroughs. (Remove portions
that are classified).
- SARA Title III Tier One and Two reports.
- Most recent site-wide EIS and/or EA.
- National Emission Standards for Hazardous Air Pollutants (NESHAP) report (if applicable).
- All Type A accident investigations reports for the last two years.
- OSHA 200 log from past two years.
- Site Radiation Control Manual and associated implementation plan.
- DOE and Contractor Quality Assurance Program Manual.
- List of Quality Assurance plans and implementation procedures.
- DOE and Contractor Conduct of Operations Manual.
- List of Conduct of Operations plans and implementation procedures.
- Operator training program documentation.
- List of ES&H policies and procedures of the Field Office and Contractor.
- Contractor's ES&H Manual.
*  List of applicable Technical Safety Requirements.
*  Applicable Safety Analysis Report(s).
- Site-specific Explosives Safety Manual (if applicable).
- Explosives Safety Policy Statements (if applicable).
- Explosives Handling, Storage, and Disposal facility Design Bases/SARs (if applicable).
- Site Fire Protection Manual.
- Site Pre-fire Plans.
- All Fire Department Procedures.
- Fire Protection staff organization charts and job descriptions.
- Staffing plans and any analyses relating to staffing for the past 12 months.
- Applicable DOE Order Compliance Documents and Compliance Schedule Agreements.
- Site Emergency Plans
APPENDIX 3-2


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business