| DOE-HDBK-1078-94
102.
PROCESS COOLANT SYSTEM
Task
Never
Importance
Difficulty
102.1
Prepare tank car for unloading.
0
12345
12345
12345
102.2
Unload tank car.
0
12345
12345
12345
102.3
Obtain moisture content
0
12345
12345
12345
samples.
102.4
Dry coolant.
0
12345
12345
12345
102.5
Regenerate molecular sieve.
0
12345
12345
12345
102.6
Leak rate systems and headers.
0
12345
12345
12345
102.7
Operate liquid transfer pumps.
0
12345
12345
12345
102.8
Operate IR pumps.
0
12345
12345
12345
102.9
Operate Beech-Russ pumps.
0
12345
12345
12345
Operate UF6-- Pit R-114 separation
102.10
0
12345
12345
12345
unit (C-335).
102.11
Obtain coolant negatives on cells
0
12345
12345
12345
and equipment.
102.12
Sample for negatives.
0
12345
12345
12345
102.13
Detect leaks through soaping
0
12345
12345
12345
(Gastech and OVA).
102.14
Calibrate OVA.
0
12345
12345
12345
102.15
Perform routine daily checks.
0
12345
12345
12345
102.16
Perform prescheduled tests and
0
12345
12345
12345
inspections.
102.17
Complete safety system
0
12345
12345
12345
documentation.
75
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |