| DOE-HDBK-1099-96
APPENDIX B - EXAMPLE DRILL SCENARIOS
Title:
Fire in Diesel Generator Area
Drill Number: 30.94.04.3
Revision Number: 0
Termination and Restoration:
Termination:
1) Normal completion:
a) The drill will be terminated when all of the following items are
accomplished.
b) The Emergency Brigade has responded to the fire emergency.
c) The reactor has been shutdown (as applicable).
d) The Shift Manager has informed appropriate management personnel,
the Fire Department and WCC.
e) The above actions and/or procedures have been completed to the
extent required by the Drill Coordinator.
2) Emergency Termination: The drill will be aborted when any person makes
the drill would challenge a Technical Specification.
LSS will be required to reset the fire systems after the drill is completed.
Restore either M-42 or M-43 as the operating diesel. Store or dispose of all
props used during the drill.
B 7-6
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |