| DOE-HDBK-1099-96
APPENDIX B - EXAMPLE DRILL SCENARIOS
Title:
Normal Control Area Heating and Ventilation Failure
Drill Number: 010-02
Revision Number: 0
Termination and Restoration:
Termination:
1) Normal completion. The drill may be terminated once the breaker has
been determined to be faulty and actions are initiated to get the RSS to fix it.
2) Emergency Termination. If Control Room environment becomes
uncomfortable; restore ventilation.
The breaker should be reclosed and Control Area H&V restarted per
SN-25.2-l.