|
| DOE-HDBK-1099-96
APPENDIX B - EXAMPLE DRILL SCENARIOS
Title:
Remote retrieval of a 1000 Curie source from the Storage Canal using Auxiliary
Retrieval Equipment (table-top discussion with walkthrough to follow or in-plant
perform)
Drill Number: 01-001
Revision Number: 0
Expected Response/Evaluation Criteria:
1) The operator should inform the Control Room of the primary crane problem.
2) Operator describes the actions used in verifying primary crane is not functioning
properly.
3) Notifications to be made by Control Room personnel. All necessary personnel would
respond.
4) The auxiliary crane should be moved into position and hooked on to the source. The
primary crane should then be detached from the source and moved out of the way and
Danger Tagged Out-of-Commission.
5) The auxiliary crane should be used to complete the source move.
Evaluation Criteria
IMPLEMENT appropriate operating procedures, abiding by cautions and limitation.
1
2
3
4
Referred to incorrect
Problems and
Minor difficulties and
Timely, accurate
procedure and failed
failures in referring to
oversights in
enactment of
to correct the error.
procedures in
referring to
procedure.
important instances.
appropriate
procedures.
IDENTIFY plant conditions requiring entry into abnormal procedures.
1
2
3
4
Serious omissions,
Some delays in
Minor delays in
Quick and accurate
delays in recognizing
recognizing off-
recognizing off-
recognition.
events.
normal conditions.
normal conditions.
B 5-4
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |