| Exhibit 2.7
DOE-HDBK-1101-96
Item
Responsible
Date
Date
Person
Forecast
Completed
Steam Tracer Circuits Active
Desuperheaters
System Commissioned
Distributed Control System (DCS)
System Problems Cleared
Alarms & Trips at Proper Settings
Field Switch Alarm & Trip Settings
Daily Check of Analyzer Zero & Span
Graphics Correct
Required Loops Checked and Working
Propane
Adequate Inventory Level
Supplier Delivery Schedule
Unloading Personnel Training
Unloading Compressor Trips in Service
Product Tanks
Ready to Receive Product-Blinds Out
Operator Training to Prevent Overfill
Quality Assurance Management System
Control Room
Operator Facilities
SCBA Available
Escape Packs Available
Acid Suits Available
Acid Suit Procedures & Training for Use
69
|