| Exhibit 2.7
DOE-HDBK-1101-96
Item
Responsible
Date
Date
Person
Forecast
Completed
System Integrity Assurance & Alarms
Control Room Alarms
Hydrocarbon Monitors & Alarms
Electrical
Required Electrical Systems in Place
Lighting Adequate
Covers on Panels per OSHA Standards
Seals Poured
Temporary Power Out of Operating Areas
Instrument Air
Instrument Air is Dry
Dry Air Alarm Working
Backup System Tested
Chilled Water
Chilled Water Circulating
Orifice Plates Properly Installed
250-psig Steam
Orifice Plates Properly Installed
Control Loops Checked
System Commissioned
40-psig Steam
Orifice Plates Properly Installed
Control Loops Checked
40 lb Letdown
40 lb Vent