|
| DOE-HDBK-1204-97
APPENDIX C
TEST ITEM EXAMPLES
C.2 Matching Test Item Examples
Satisfactory:
Test item:
Select the answers needed to complete each sentence. Write the letter of each
answer in the blank provided.
In the containment air return system, both fans are actuated upon the
actuation signal but are delayed starting for
minutes. They continuously draw
air from the dome of the containment vessel and from the following pocketed spaces
,
,
, and
. (6 points)
(a) High pressurizer pressure
(g) Accumulator spaces
(b) Containment high-high
(h) Lower containment
pressure
compartment
(c) Two
(I) Cable penetration area
(d) 10
(j) Steam generator enclosures
(e) 60
(k) Pressurizer enclosure
(f) Instrument room
(l) Upper containment.
Answer:
(b), (d), (f), (g), (I), and (k).
C-7
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |