Click here to make tpub.com your Home Page

Page Title: C.2 Matching Test Item Examples cont'd
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home

   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 



DOE-HDBK-1204-97
APPENDIX C
TEST ITEM EXAMPLES
Unsatisfactory:
Test item:
In the containment air return system, both fans are actuated upon a
actuation
signal but are delayed starting for
minutes. They continuously draw air from
the dome of the containment vessel and from the following pocketed spaces
,
,
, and
. (6 points)
(a) One hour
(g) Ten minutes
(b) Instrument room
(h) Containment high-high pressure
(c) HPZ
(I) Cable penetration area
(d) Accumulator spaces
(j) S/G enclosures
(e) One minute
(k) Pressurizer enclosure
(f) Lower containment
(l) Upper containment
compartment
compartment
Answer:
(h), (g), (b), (d), (j), and (k).
Comment:
C
Directions are implied but not given.
C
Abbreviations are used when complete terms should be specified. (HPZ, S/G).
C
Distractors are not logically grouped (i.e., by signal, time, and spaces).
C-8


Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business