|
| DOE-HDBK-1204-97
APPENDIX C
TEST ITEM EXAMPLES
Unsatisfactory:
Test item:
In the containment air return system, both fans are actuated upon a
actuation
signal but are delayed starting for
minutes. They continuously draw air from
the dome of the containment vessel and from the following pocketed spaces
,
,
, and
. (6 points)
(a) One hour
(g) Ten minutes
(b) Instrument room
(h) Containment high-high pressure
(c) HPZ
(I) Cable penetration area
(d) Accumulator spaces
(j) S/G enclosures
(e) One minute
(k) Pressurizer enclosure
(f) Lower containment
(l) Upper containment
compartment
compartment
Answer:
(h), (g), (b), (d), (j), and (k).
Comment:
C
Directions are implied but not given.
C
Abbreviations are used when complete terms should be specified. (HPZ, S/G).
C
Distractors are not logically grouped (i.e., by signal, time, and spaces).
C-8
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |