APPENDIX B
PRACTICAL FACTORS CARD
Position/Job: Reactor Operator
Duty Area: Power Plant
Name: _____________________________________________________________
Instructions: The trainee must perform, simulate, or observe (as required and indicated by
the Xs) all practical factors listed on this card. Activities indicating a single performance level
may not be changed: activities indicating more than one performance level (Perform,
Simulate, Observe) may be satisfied by completing any one. The order of preference for the
actions shall be (1) perform, (2) simulate, (3) observe.
Upon satisfactory completion of each activity, a qualified instructor or qualified operator shall
circle the action taken, and sign (using full signature) and date in the appropriate place.
FUNCTIONAL LOGS
PSO
Signature
Date
Complete Log 1-A (Section 3)
X
Complete Log 1-A (Section 10)
X
Complete Log 1-D
XX
Complete Log 7-B
X
FEEDWATER AND CONDENSATE SYSTEMS
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
Fill the hotwell and condensate system (including
No. 2 feedwater heater)
XX
Fill yard lines
XX
Recirc. yard lines
X
Fill the steam drum with SUFWP
X
Line up to fill steam drum with MFP's
X
Line up to fill steam drum with ECP
XX
COOLING-WATER SYSTEMS
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
Start up condenser cooling-water system
XX
Route CCW to tower basin using local operators
XX
Drain main cooling-tower basin
XX
Cross-connect cooling-water systems
X
Reset main cooling-tower-fan vibration switch
XX
Put steam on cooling-tower basin
XX
Drain main cooling-tower risers
XX
Monitor and control basin level
XX
MAIN STEAM SYSTEM
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
Draw vacuum on main condenser
X
Warm up main steam header
X
Warm up turbine chest
X
Place auxiliary steam cross-connect in service
X
Shift gland seal to main steam
X
Blow down superheaters during standby
X