| DOE-HDBK-1206-98
APPENDIX B
PRACTICAL FACTORS CARD
Position/Job: Reactor Operator
Duty Area: Power Plant
Name: _____________________________________________________________
FUNCTIONAL LOGS
PSO
Signature
Date
TURBINE GENERATOR
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
Start up oil system on turbine generator and test
X
Test overspeed trip of turbine generator
X
Shift and inspect L.O. strainers
X
Start up turbine generator
X
Route generator H, to atmosphere
X
Route generator H, to casing
X
Purge generator with CO,
XX
Reset auto transfer scheme
X
Parallel turbine generator with INEL loop
X
Place both LO coolers in service
XX
Fill generator with H,
XX
Place turbine generator on turning gear
X
Shift and replace hydrogen bottles
X
POWER-PLANT EVOLUTIONS
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
Plant heat up
XX
Plant cool down
XX
Start up power plant from hot standby to full power
X
Shut down power plant from power to hot standby
X
Cool down and drain steam, feed, and condensate
systems
X
X
Recover from loss of normal power
X
X
Perform monthly running equipment switchover
X
Place a sight glass in service
X
Chemical analysis of all water chemistry
X
LOG READINGS
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
Take six sets of power-plant log readings: Three
sets must be 0030 readings (midshift), and one set
(0030) readings on Monday (midshift).
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
No. 1 - 0030 (midshift)
X
No. 2 - 0030 (midshift)
X
No. 3 - 0030 (midshift)
X
No. 4 - 0030 Monday, (midshift)
X
No. 5
X
No. 6
X
I hereby verify that the named individual has satisfactorily completed all power-plant-area
practical factors and has demonstrated the necessary abilities to perform the indicated activities.
______________________________________________/_________________
Alternate Reactor Shift Supervisor
Date
B-4
|