|
| DOE-HDBK-1206-98
APPENDIX B
PRACTICAL FACTORS CARD
Position/Job: Reactor Operator
Duty Area: Reactor
Name: _____________________________________________________________
Instructions: The trainee must perform, simulate, or observe (as required and indicated by the
Xs) all practical factors listed on this card. Activities indicating a single performance level may
not be changed: activities indicating more than one performance level (Perform, Simulate,
Observe) may be satisfied by completing any one. The order of preference for the actions shall
be (1) perform, (2) simulate, (3) observe.
Upon satisfactory completion of each activity, a qualified instructor or qualified operator shall
circle the action taken, and sign (using full signature) and date in the appropriate space.
FUNCTIONAL LOGS
PSO
Signature
Date
Complete Log 1-A (Section 2)
X
Complete Log 1-A (Section 4)
X
Complete Log 1-A (Section 5)
X
Complete Log 1-A (Section 8)
X
Complete Log 1-A (Section 9)
X
Complete Log 1-C
X
X
Complete Log 7-A
X
Participate in reactor startup or restart
X
XX
Perform reactor startup or restart
X
Participate in reactor shutdown (anticipatory)
X
XX
Perform reactor shutdown (normal)
X
Plot CO/CN during startup
X
Perform control-rod rebank
X
Complete ascending PRD calculation
X
Participate in reactor interlock checks (at console)
X
Participate in fuel-handling interlock checks (at console)
X
Complete reactivity plot calculation
X
Compute reactor MWhr
X
Complete control-rod calibration
X
Perform rod drops at power
X
X
Complete calorimetric determination of power (Log 7-B)
X
Complete CO/CN plots during unrestricted fuel handling
X
Perform control-rod comparison without use of DAS
X
Calculate reactor 60-s period
X
Calculate critical rod position for reactor restart, then
60-s period
X
I hereby verify that the named individual has satisfactorily completed all reactor-area practical
factors and has demonstrated the necessary abilities to perform the indicated activities.
________________________________________________/_______________
Alternate Reactor Shift Supervisor
Date
B-6
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |