|
| DOE-HDBK-1206-98
APPENDIX B
PRACTICAL FACTORS CARD
Position/Job: Reactor Operator
Duty Area: Electrical
Name: _____________________________________________________________
Instructions: The trainee must perform, simulate, or observe (as required and indicated by the
Xs) all practical factors listed on this card. Activities indicating a single performance level may
not be changed: activities indicating more than one performance level (Perform, Simulate,
Observe) may be satisfied by completing any one. The order of preference for the actions shall
be (1) perform, (2) simulate, (3) observe.
Upon satisfactory completion of each activity, a qualified instructor or qualified operator shall
circle the action taken, and sign (using full signature) and date in the appropriate space.
P
S
O
Signature
Date
Complete Log 1-A (Section 1)
X
Start up and parallel generator to INEL loop
X
Recover from trip of the auto transfer scheme
X
Recover from loss of normal power
X
Rack out a 13.8-kV or 2400-V breaker
X
Place constant power on one UPS using output
X
breakers and bus tie
Place MCC S1A on MCC S1B
X
Manually start 400/100-kW diesel
X
Shift 125-Vdc distribution system to No. 1 UPS
battery
X
Manually separate the turbine-generator from the
INEL loop
X
Properly tag out electrical equipment
X
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
LOG READINGS - Take six sets of electrical log
readings
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
No. 1
X
No. 2
X
No. 3
X
No. 4
X
No. 5
X
No. 6
X
I hereby verify that the named individual has satisfactorily completed all electrical-area practical
factors and has demonstrated the necessary abilities to perform the indicated activities.
________________________________________________/_______________
Alternate Reactor Shift Supervisor
Date
B-5
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |